What does a professional website in Graz cost?
What a professional website in Graz costs, what drives the price, and how a commission model lowers your risk. An honest breakdown.
"What does a website cost?" is the most common question we hear — and the honest answer is: it depends. But "it depends" helps no one. So here's a realistic breakdown of the price ranges and the factors that actually drive them.
The three price tiers
Website projects in Graz roughly fall into three categories — from website builders to fully custom-built brand websites.
- Website builders (Wix, Squarespace): cheap to start, but limited in performance, SEO and individuality.
- Agency website with a CMS (e.g. WordPress): flexible, but often slower and more maintenance-heavy.
- Custom-built (Next.js, statically generated): maximum load speed, full SEO control, higher upfront investment.
What really drives the price
Scope decides: number of pages, how custom the design is, features like contact forms with automatic emails, multilingual content, an SEO foundation and ongoing support. A single-page business card is a different thing from a 12-page website with an SEO setup and social media integration.
Why performance is worth the price
A PageSpeed score of 100 isn't a gimmick — it directly affects ranking, bounce rate and trust. Saving on the foundation means paying later in lost enquiries. Our projects for Sportbuffet Joham and s'Reindl Catering both went live in under 4 weeks and reach top performance scores.
The commission model: less risk for you
Instead of a large upfront fee, we also offer a commission-based model: you pay little to nothing until your project generates revenue. That way we share the risk — and have a genuine stake in your website working.
Frequently asked questions
Is there a fixed price?
Yes. For projects with a clear scope we work with a transparent fixed price and no hidden costs. Alternatively there's the commission model.
How long does a website project take?
Most projects go live within 3–6 weeks. Both reference projects were completed in under 4 weeks.